Sarost

Client: Sarost

Location: Tunisia

Services provided: Installation equipment, including 400te mobile carousel , tensioner , loading arm , and turntable . Full rigging team , and carousel technicians .

Project summary: Mooring Systems Ltd, were asked to provide a solution to install 1400mt of 6” flowline . This was a challenging project, as the hose was delivered in 38 x 36mt sections. Due to the long ridged sections on the hose, the hose was installed in 3 trips , with no issues .

Carousel with flowline , on the back deck of Sarost 5

Projects

Riser Installation

Location: India Client: ONGC Mooring Systems installed a 400mt high pressure riser offshore India. Due to the nature of...

Westaf Stand Alone Mooring

Location: Nigeria Client: ABC Maritime Water Depth: 65m Tanker: 250,000 DWT Seastate: Hs = 5m

DIDON TCMS Installation

Location: Tunisia Client: PA Resources Water Depth: 80m No. of Risers: 1 + Umbilical Seastate: Hs = 7m

View all Projects →

Equipment Hire

Mooring Components

The mooring node is for connecting the three legs for the TCMS mooring, and the chafe chain on the upper lug of the node. Built by Vicinay in Spain, the node weights 12 tonne and fits 130mm Shackles .

76mm RQ4 Chain

Mooring systems Limited has presently 20,000 ft of 76mm anchor chain grade R4 new and unused in stock. Manufactured by Vicinay in Spain this chain is available for rental or purchase.

View all Equipment Hire →

Recent Projects

Masirah Oil

Client : Masirah Oil Location : Oman Services provided : Supply of 750mt of 6” Saturn Manuli hose , installation procedures , installation equipment , and installation team .

Kris Energy

Client : Kris Energy Services provided : Project engineering / client rep .

View all Recent Projects →