Cendor Malaysia – Riser change out

Mooring Systems Ltd reacted quickly to change out an existing riser for the Cendor field development offshore Malaysia – the riser had been damaged by a wire being dragged over the hose. Mooring Systems air freighted out a new riser (200mt) from stock, mobilised spooling equipment in Singapore, and removed the old hose, installed the new one, and recovered the old riser.

200mt riser hose ready for deployment

Projects

Riser Installation

Location: India Client: ONGC Mooring Systems installed a 400mt high pressure riser offshore India. Due to the nature of...

Westaf Stand Alone Mooring

Location: Nigeria Client: ABC Maritime Water Depth: 65m Tanker: 250,000 DWT Seastate: Hs = 5m

DIDON TCMS Installation

Location: Tunisia Client: PA Resources Water Depth: 80m No. of Risers: 1 + Umbilical Seastate: Hs = 7m

View all Projects →

Equipment Hire

Mooring Components

The mooring node is for connecting the three legs for the TCMS mooring, and the chafe chain on the upper lug of the node. Built by Vicinay in Spain, the node weights 12 tonne and fits 130mm Shackles .

76mm RQ4 Chain

Mooring systems Limited has presently 20,000 ft of 76mm anchor chain grade R4 new and unused in stock. Manufactured by Vicinay in Spain this chain is available for rental or purchase.

View all Equipment Hire →

Recent Projects

PA Resources Project

Services provided: Engineering / Mooring team / rigging container c/w equipment / spooler and riser.

TruAxis Project

Services provided: Supply of Spooling equipment, installation rigging team .

PetroSA Project

Services provided: Supply of 500mt of Manuli riser. Spooling equipment / buoyancy / Riser design – analysis.

View all Recent Projects →