What we do

Mooring Systems Ltd. Manuli hoses, a unique partnership.

We supply the correct equipment, to get the hoses from the storage reels, onto the deployment reel. Each hose is measured, and marked out every 10mt, and where ballast clamps will be attached (optional) or where buoyancy modules will also be attached. This is predetermined during the engineering phase.

Once the hose is marked, and rollers set up on the quayside, the hose is rolled out from A to B, ensuring no twists are in the hose.

When the hose is spooled towards the deployment spooler, the 2 flanges are lined up, cleaned, connected, bolted up, and torqued to the correct setting.

Buoyancy inserts are also fitted in advance, to save on installation time offshore.

Final checks, before the hose is spooled.

Contact Details

Aberdeen Tel:+44 (0) 1224 624666

Montrose Tel:+44 (0) 1674 671895

Email Address:d.duncan@mooringsystemsltd.com

Whatsapp: 447803020373

Projects

DIDON TCMS Installation

Location: Tunisia Client: PA Resources Water Depth: 80m No. of Risers: 1 + Umbilical Seastate: Hs = 7m

Westaf Stand Alone Mooring

Location: Nigeria Client: ABC Maritime Water Depth: 65m Tanker: 250,000 DWT Seastate: Hs = 5m

Riser Installation

Location: India Client: ONGC Mooring Systems installed a 400mt high pressure riser offshore India. Due to the nature of...

Blue Water /KD Marine Project

Location : Montrose quayside facility Client : Blue Water /KD Marine Services provided:Spooling operation,cranes, forkliftsrigging teams,storage, inside and outside.

View all Projects →

Equipment Hire

Mooring Components

The mooring node is for connecting the three legs for the TCMS mooring, and the chafe chain on the upper lug of the node. Built by Vicinay in Spain, the node weights 12 tonne and fits 130mm Shackles .

76mm RQ4 Chain

Mooring systems Limited has presently 20,000 ft of 76mm anchor chain grade R4 new and unused in stock. Manufactured by Vicinay in Spain this chain is available for rental or purchase.

View all Equipment Hire →

Recent Projects

Masirah Oil

Client : Masirah Oil Location : Oman Services provided : Supply of 750mt of 6” Saturn Manuli hose , installation procedures , installation equipment , and installation team .

Sarost

Client: Sarost Location: Tunisia Services provided: Installation equipment, including 400te mobile carousel , tensioner , loading arm , and turntable . Full rigging team , and carousel technicians .

Kris Energy

Client : Kris Energy Services provided : Project engineering / client rep .

PA Resources Project

Services provided: Engineering / Mooring team / rigging container c/w equipment / spooler and riser.

View all Recent Projects →