Mooring Systems Ltd

News

  • Mooring Systems Flexible Flowline for BP Valhall Project Mooring Systems' Spooler lifted on boardMoorings Systems has completed the installation of a flexible export flowline to transfer water to a DP tanker at the BP Valhall platform complex in the Norwegian North Sea. The project involved installation of 1,160 metres, 6” flexible flowline, front end engineering, mobilisation of equipment, and offshore installation team. Located in 70 m of water,... Read the rest.
  • Mooring Systems launches new 400-tonne mobile spooler Mooring Systems Ltd has launched what is believed to be the most adaptable offshore, mobile spooler of its kind in the UK, that will offer significant advantages for clients operating in the oil and gas and the renewables markets. The spooler, which was designed and built by Caley Ocean Systems at East Kilbride, has been... Read the rest.
  • Deepwater TCMS Mooring and Production System for Marginal Fields Tricatenary deepwater mooring and production system for marginal fields low resMooring Systems Ltd has announced a tricatenary mooring and riser system for floating production, storage and offtake (FPSO) vessels in marginal, deepwater and ultra-deepwater, oil and gas fields. The deepwater tricatenary mooring system (TCMS) provides a simpler, more cost-effective mooring, and requires less FPSO modification, than traditional deepwater mooring systems. Deepwater TCMS comprises three synthetic... Read the rest.
  • Arthit – Latest News newsarthitMooring Systems Ltd were contracted by EMAS Offshore a Singapore based company to supply a TCMS® system for the Lewek Arunthai FPSO Arthit Field in Gulf of Thailand. The scope of supply was the TCMS® hardware including anchors, guide frames and node as well as Engineering Design of the Riser and Mooring system. The scope was completed... Read the rest.
  • BW Carmen Project qcdc23002Mooring Systems Ltd. Supplied a QCDC fluid transfer system for the Bressy EWT. This unit was installed onboard the Stena Spey. 400mt of export pipline c/w hose end connector and ESD valve was installed onboard the BW Carmen. MSL also supplied rigging supervision and riggers for both Rig and vessel. Once hooked up , heavy... Read the rest.
  • Ikdam Project – Latest News newsikdamMooring Systems Ltd were approached by Petrofac Engineering Ltd to provide equipment and expertise to modify the existing umbilical arrangement offshore Tunisia. Mooring Systems role was to: Assist with project planning. Write rigging and lifting plans for lowering umbilical , transferring onto a DSV. Participate in site visits on the FPSO, support vessels. Procure ,... Read the rest.
  • Didon FPSO Hook-up Complete newsdidonMooring Systems Ltd successfully installed the permanent storage tanker FPSO Didon onto the TCMS® mooring system offshore Tunisia in September 2007. The system completes the latest stage of the field development. Last year PA Resources (field operator) installed a new production jacket. The crude oil is exported via a subsea pipeline, connected by a flexible riser... Read the rest.